Power Factor Correction Calculator

Billed demand, monthly and payback-weighted penalty, capacitor bank kVAR with standard step rounding. 5 inputs, 6 outputs with grouped results.

Inputs

Metered

Billed peak kW.

Measured PF.

Economics

Utility threshold.

Penalty dollars per kW.

Installed bank cost per kVAR.

Result

Apparent power
66.7 kVA
Billed demand
63.33 kW
Monthly penalty
$160.00
Exact capacitor
27.7 kVAR
Standard bank (5 kVAR steps)
30 kVAR
Payback
4.7 mo
Screening calculation only. Verify against NEC articles cited on the page and the equipment nameplate; the authority having jurisdiction governs.

Related calculators

Calculator

Control Transformer VA Sizer

Control power transformer VA per NEC 450: inrush plus sealed burden stepped to a standard CPT size. 5 inputs, 4 outputs with grouped results.

Outputs: Required VA · Standard CPT size · Primary current

Open calculator

Calculator

Harmonic Neutral Sizer

Neutral ampacity for nonlinear loads with the 200% neutral call. 3 inputs, 3 outputs with grouped results.

Outputs: Calculated neutral current · Required neutral ampacity · Use 200% neutral (1=yes)

Open calculator

Calculator

kW kVA Power Factor Converter

Convert kW, kVA, PF both ways; capacitor kVAR to reach target PF; annual demand-cost of low PF. 4 inputs, 5 outputs with grouped results.

Outputs: Real power · Reactive power · Capacitor to target PF

Open calculator

Calculator

Panel Load Summary

Sum up to five load groups with demand factor into feeder amps, kVA and standard main size. 9 inputs, 6 outputs with grouped results.

Outputs: Connected load · Demand load · Demand kVA

Open calculator